管件设备 中频弯头机

企业快讯-向您介绍本公司新闻

弯管机使用方法英文版English

发布时间:2010.06.16 来源:沧州中泰管件设备有限公司 阅读次数:
 

Reference manual bender:
Electric pump to use reference manual. First working cylinder screw the internal thread of block parties, so that tanks installed in the bracket on the rear wheels down. According to the diameter of the pipe selected child dies, set in the plunger on the two rollers corresponding to the slot toward the die, and then into the appropriate size hole in the flower board, and then spend plate cover, will be the pipe inserted into the slot, then high-pressure tubing quick connector on the end of the activities part of the pull back and set the connector in the work tank, electric fuel pump put on the screws tightened, you can bend. Pipe finished, relax oil discharge screw, plunger automatically reset.
Notes
(1) electric pump to use reference manual.
(2) Never be in a load, unload quick connector.
(3) The equipment is the oil to medium oil and the equipment necessary to do the cleaning and maintenance work, in order to avoid blockage or leakage affect the results.